Aboor Alshamal Contracting العربية

Quality and safety

Quality and safety are part of our daily work: before, during and after execution.

Before

  • Review of drawings and specifications
  • Site study
  • Execution plan
  • Quality requirements set

During

  • Daily follow-up
  • Material testing
  • Level checks
  • Reinforcement and pour monitoring
  • Required laboratory tests
  • Documented stages

After

  • Final tests
  • Closing remarks
  • Site clean-up
  • Formal handover
A concrete slump test on site

Occupational health and safety

  • Risk assessment before work starts
  • A safety plan for each site
  • Personal and collective protection
  • Machinery movement control and secured excavations
  • Guidance and warning signs
  • Monitoring of workers’ compliance

Environmental care

  • Clean sites
  • Safe disposal of construction waste
  • Dust and emission reduction
  • Protection of public utilities
  • Site reinstatement on completion

Have a project or a pour coming up?

Send us the location and the type of work, and we will contact you about the details.

Message us on WhatsAppCall us +962 7 9780 0858